Más populares

Metal Injection Molding vs. Binder Jetting [1/2]

MIM is a mature technology used for the large scale production of small and complex components with high precision and that not require subsequent processing.

What's the downside of Metal Injection Molding?
Are there any alternatives?

Let's take a look at a cheaper and more versatile technology, 3D Binder Jetting, analyzing pros and cons.

Leer todo el artículo...

Publicado el 1/16/2017
Categorías: Insider tips

Hot-wall vs cold-wall vacuum furnaces: which one to choose

The demands of heat treatment industry are for higher temperatures, lower pressures, rapid heating and cooling capabilities, and higher production rates.  This has inevitably led to the use of so-called “cold-wall” vacuum furnaces, to the detriment of hot-wall furnaces, which are now considered obsolete. So, let’s see hot-wall and cold-wall furnaces - what could these be and how do they differ from each other?

Leer todo el artículo...

Publicado el 10/21/2016
Categorías: Maintenance

Vacuum furnace: how to calibrate the cooling system
Reproducir el vídeo...

As you know, heat dissipation is critical in the thermal process. For that reason, in this video, I'm going to show you how to calibrate the cooling system for an optimal management of your vacuum furnace. A correct calibration ensures greater efficiency of the cooling system and a significant savings in terms of energy consumption of pumps and the water used.

Ver el vídeo...

Publicado el 11/10/2016
Categorías: Insider tips

Vacuum furnaces: 5 reasons to choose a safety PLC

Today there is a great deal of talk about safety PLCs. This, obviously, creates questions such as: why a safety PLC should be installed on my vacuum furnace? Are safety PLCs really useful? What are the advantages compared to traditional safety relays? Therefore, I want to give you 5 good reasons to install a safety PLC to maintain an efficient internal control system.

Leer todo el artículo...

Publicado el 4/12/2021
Categorías: Aerospace
Etiquetas: Nadcap, Calibration, Test

AMS 2750F pyrometric requirements for heat treatments: calibrating process instrumentation

There are many innovations introduced by AMS (Aerospace Material Specifications) 2750 revision F concerning the process instrumentation.

We will analyze the 4 new requirements requested by the legislation and the necessary precautions regarding the instrumentation calibration.

We will conclude by listing in detail all the information to be reported on the instrument calibration certificates.

Leer todo el artículo...

¿Le gustaría que algún tema en particular fuera abordado en este blog?

Si tiene una idea para un artículo o quiere hacernos alguna pregunta, estaremos encantados de escucharle.